Boston Freightliner

CM&B is proud to announce the opening of the new Boston Freightliner facility in Everett, MA. As part of the Encore Boston Harbor project, the facility was relocated from Bow Street to Air Force Road. The project included constructing a 28,800SF, two-story building with a parking lot for 10 semi-trucks and 40 vehicles.

Project Highlights:

  • Urban site with soil management plan
  • New utilities – electric, gas water, sewer, drainage and roadway/site lighting
  • Precast concrete piles/structural slab foundation system
  • Pre-engineered metal building shell with mezzanine
  • Complete fit-up for truck service facility

Share this post